Beautiful Art, Space

|

Yesterday, November 4, 2017, Artworks organized its most successful “Art All Day” Program ever. Thousands of people wandering around Trenton viewing art, and several hundred showed up at Roebling Lofts, where we hosted six artists.

A Kitchen

|

Every loft in Roebling Lofts is equipped with a kitchen that is not only beautiful, but also delivers true gourmet functionality.  Every one is equipped with an induction range:  this delivers the heat response of a gas stove, with the cleanliness of electric cooking.

Read More

The Elevator

|

We’re scrambling to open the third floor for occupancy. Final inspections are progressing well, and we’re hoping to make an exciting announcement any day now. In any event, on Friday, June 9, our elevator passed its state inspection, and we’re now free to use it!

Read More

Electricity and Bathrooms (360 view)

|

Electricity is now on in the building, so we can turn on the lights and photograph a bathroom (finally!!!). Our first tenants will be able to move in very soon!

Like Nice Fixtures?

|

The importance of nice plumbing fixtures is often underrated, since they’re something you use every day.  A beautiful fixture delivers continual, small doses of pleasure.  Two of the three HHG developers are architects, which has allowed an obsessive level of attention to the smallest details,

Read More

Like Exposed Brick?

|

Of the 138 units in Roebling Lofts, 12 have at least one complete wall of exposed brick: four Manhattan units, one Lindbergh unit, and one Wright Bros Unit (all of which feature a brick wall across the whole living area);

Read More

Finishing Up the 3rd Floor

|

If you’re following us closely, you know we’re opening up the north end of the 3rd floor first. A lot has to happen before we can do that, but then again we have a couple of hundred people working on it.

Read More

Yin and Yang

|

Finishing work on the fourth floor is moving rapidly to completion!  Most of the units on the second floor are 2 Bedroom/2 Bath units which fall into either the “Lindbergh” or “Wright Brothers” floor-plan types.  It seemed appropriate to name these top-floor units after two of the most famous aviators in history,

Read More

Finishing Signs

|

January 4, 2017, we’re opening a temporary Leasing Office in a trailer on-site. We anticipate the first lofts will be occupied in March of this year. How is that possible? Well, behind those temporary windows there’s a LOT going on!

Read More

Window, Window, Through the Wall

|

Construction reached another major milestone last week, when the first actual window was installed.  This is the start of a 5-week process.  These are massive, ultra high performance windows, and are very heavy.  I had the pleasure of watching a very professional crew work through installing the very first one.

Read More

1 2