As of March 21, focus was on prepping the top floor: cleaning out the rotten roofing materials (to replace with a new roof); clearing the window openings, patching sub-flooring. Note a temporary staircase was built on the north facade in order to facilitate safe access.
2016-03-21 Construction Photos
posted in: Construction, Construction Galleries, Image Galleries
0