Lots happening! First spiral stairs going in! Roof getting solar panel attachment points and insulation. Steel lintels installed in preparation for elevator lobbies. 3rd floor framing moving forward, and 4th floor prep. Wow!
- The first spiral stairs waiting to be moved into the building.
- Crane picking up stairs
- Moving stairs towards building
- Lifting Stairs
- Lifting stairs higher
- Stairs through window
- First stairway inside
- Clerestory openings
- 2nd floor getting patched
- Lintel for elevator lobby
- Fire stairwell under construction
- Welding
- Welding closeup