Flooring, the Final Frontier!
The last big construction step before we can move people into Roebling Lofts is that we need to install the finish flooring. Second through fourth floor units get strand woven bamboo on the entry level. Installation started today. It won’t be long now!
The Brooklyn Walkthrough
[Floor plans and information]
3D Walk-Throughs
Swipe, or click on slider controls, to switch between videos. [cycloneslider id=”3d-walk-through-slider”]