Construction is continuing at a rapid pace. Finish work on the third and fourth floors is blazing along behind temporary windows, with sound insulation and sheet rock going into most units. Framing on the second floor is just a month or so behind.
- Sheetrock delivery to third floor
- Moving sheetrock to a unit
- Sheetrock in 3rd floor unit waiting to be hung
- 3rd floor unit ready to be sheetrocked
- View of temp window and unit from sleeping platform
- Returning after lunch to resume sheetrocking 3rd floor unit
- Hanging sheetrock, 3rd floor
- More sheetrock hanging
- Hanging sheetrock 4th floor unit
- Scaffolding for masonry restoration, east facade
- Masonry restoration underway
- Masonry restoration view from 3rd floor window
- Fire stairs going in. Temp handrails in prep for concrete pour
- Studs on first floor