Work across the entire project is going well. The 3rd floor is most advanced, with many units now framed out, and spiral stairs installed. Plumbing, electric, sprinklers, and other systems are going in rapidly. Just behind the 3rd floor, is the 4th, with truly dramatic, mostly 2-bedroom units, going in. Very cool!!